Factory Construction

posted in: Traffic | 0

Proposed construction schedule = 12 months (projected) Excavation of site = Removal of 40,000m³ /60,000 tonnes of soil and stone = 1,500 truckloads @ 40 tonne per truck which is = 3,000 return trips through Skibbereen = 50 truck loads … Read More